MINA GAMEEL FATHI
Maintenance Manager
Profile summary
Maintenance Manager with 15+ years in GMP-compliant manufacturing, managing 110M+ EGP projects and 19+ technician teams. Expert in international procurement, OEE improvement (60% to 80%), and cost-saving initiatives delivering 700,000 EGP annual savings. Proven ability to adapt to pharmaceutical regulatory environments.
Career highlights
TPM Program Implementation: Implemented comprehensive TPM program, increasing OEE from 60% to 80% and reducing unplanned downtime by 40%.
Strategic Inventory Optimization: Managed annual maintenance budget of 70M EGP, achieving 15% cost reduction through strategic inventory optimization.
Key skills
Professional experience
Strategic Leadership & Operational Excellence • Lead and develop team of 19+ engineers and technicians, optimizing maintenance operations across manufacturing facility • Manage annual maintenance budget of 70M EGP, achieving 15% cost reduction through strategic inventory optimization • Managed preventive maintenance and predictive maintenance programs for manufacturing equipment • Implemented comprehensive TPM program, increasing OEE from 60% to 80% and reducing unplanned downtime by 40% • Drive continuous improvement initiatives generating 700,000 EGP in annual operational savings • Improved equipment reliability through root cause analysis and continuous improvement
- Lead and develop team of 19+ engineers and technicians, optimizing maintenance operations across manufacturing facility
- Manage annual maintenance budget of 70M EGP, achieving 15% cost reduction through strategic inventory optimization
- Managed preventive maintenance and predictive maintenance programs for manufacturing equipment
- Implemented comprehensive TPM program, increasing OEE from 60% to 80% and reducing unplanned downtime by 40%
- Drive continuous improvement initiatives generating 700,000 EGP in annual operational savings
• Managed preventive maintenance programs, reducing equipment breakdowns by 35% • Supervised technical teams to ensure 24/7 production coverage • Implemented root cause analysis for critical equipment failures
- Managed preventive maintenance programs, reducing equipment breakdowns by 35%
- Supervised technical teams to ensure 24/7 production coverage
- Implemented root cause analysis for critical equipment failures
• Conducted comprehensive equipment inspections and preventive maintenance • Achieved 40% reduction in unplanned downtime through systematic maintenance protocols
- Conducted comprehensive equipment inspections and preventive maintenance
- Achieved 40% reduction in unplanned downtime through systematic maintenance protocols
Education
Graduation Project: Electrical Power Distribution (Grade: Excellent)